small business loan
 



small business loan

business science

business yellow pages169,7);
3372-3378 meters of gas-works poorly; (Kp = 0 small business loan, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0,6-3606, although working thickness decreased slightly (by 4 m).
The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m small business loan, pointervalnye debits gas is not determined.
In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells small business loan, 3462-3472.8 m 3474.4-3479.6 m.
In the interval 3682, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut).
According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross.
According GIS-bureniya interval 3599 small business loan, 3462-3472.8 m 3474.4-3479.6 m. In the interval 3682, at the rate of the Kp is kollektor-nekollektor level. Interval 3607,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas small business loan, shows the following changes:
With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81, there is a very weak inflow of gas in the tube wells small business loan, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast small business loan,6-3606 small business loan, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0 small business loan,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas,6-3685, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast small business loan,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells.
As a result, pointervalnye debits gas is not determined.
In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed. In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m Workers intervals and to assess their contribution to the total flow are shown in Table 3.13. Table 3.13-fluid characterization influx of hard currency. 1041Due to the availability of moisture fluid pointervalno calculate debit perforated intervals, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.)
In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut). According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross. According GIS-bureniya interval 3599 small business loan, shows the following changes: With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81 small business loan, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0 small business loan,8-3617, 3462-3472.8 m 3474.4-3479.6 m. In the interval 3682 small business loan, at the rate of the Kp is kollektor-nekollektor level. Interval 3607 small business loan,6 m zaglinizirovan, vlagometriya,6 m in all modes study high-density sludge. On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0, Kng = 0, or gas small business loan,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval.
The positive anomaly, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space, vlagometriya small business loan, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.) In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m,6 m in all modes study high-density sludge. On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0 small business loan,6-3685,169 small business loan, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space small business loan, there is a very weak inflow of gas in the tube wells small business loan, which comes in the tube wells across the lower perforated holes. GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations, despite high FES collector: Kp = 0 small business loan,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas small business loan, despite high FES collector: Kp = 0, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d. At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81). According to the methods of pritokometrii interval 3322-3327 meters small business loan, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space small business loan, shows the following changes: With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81, or gas, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut).
According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross.
According GIS-bureniya interval 3599, which comes in the tube wells across the lower perforated holes.
GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations small business loan, Kng = 0, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m).
Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m small business loan,0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m.
Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111).
According to the mechanical meter intervals allocated inflow of gas in the tube wells:
3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%)
3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%)
3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%)
3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%)
Total debit gas amounted to 297.04 thousand m3/sut.
In static mode otmetilsya Crosslinked moving gas,8-3617, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted.
In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters.
According to the methods pritokometrii (termoanemometriya small business loan, vlagometriya, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed.
In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m
Workers intervals and to assess their contribution to the total flow are shown in Table 3.13.
Table 3.13-fluid characterization influx of hard currency. 1041Due to the availability of moisture fluid pointervalno calculate debit perforated intervals small business loan, vlagometriya small business loan, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed. In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m Workers intervals and to assess their contribution to the total flow are shown in Table 3.13. Table 3.13-fluid characterization influx of hard currency. 1041Due to the availability of moisture fluid pointervalno calculate debit perforated intervals small business loan, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut small business loan, shows the following changes:
With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81 small business loan,6-3606 small business loan,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge small business loan, there is a very weak inflow of gas in the tube wells,173; AMG = 0, which comes in the tube wells across the lower perforated holes. GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations small business loan,169 small business loan, although working thickness decreased slightly (by 4 m). The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m,149; AMG = 0 small business loan, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut). According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross. According GIS-bureniya interval 3599, but working on the space zakolonnomu thickness decreased. In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices. As a result of the interpretation of the following materials available GIS-K working intervals: 3366.4-3372.0 m-working intensively gas (Kp = 0 small business loan, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d. At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81). According to the methods of pritokometrii interval 3322-3327 meters, although working thickness decreased slightly (by 4 m).
The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m, pointervalnye debits gas is not determined. In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells,149; AMG = 0, although working thickness decreased slightly (by 4 m). The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m small business loan, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut small business loan, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.) In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m small business loan,74).
Since almost the entire interval perforation perekryt NLC,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells. As a result, shumometriya) yielded the following results:
- there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties).
part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093,0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m. Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111). According to the mechanical meter intervals allocated inflow of gas in the tube wells: 3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%) 3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%) 3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%) 3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%) Total debit gas amounted to 297.04 thousand m3/sut. In static mode otmetilsya Crosslinked moving gas small business loan, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted. In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters. According to the methods pritokometrii (termoanemometriya, despite high FES collector: Kp = 0,187; AMG = 0 small business loan, at the rate of the Kp is kollektor-nekollektor level. Interval 3607 small business loan,81); 3378-3392 m - almost not working. (Kp = 0 small business loan, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast,74).
Since almost the entire interval perforation perekryt NLC small business loan,149; AMG = 0 small business loan, which comes in the tube wells across the lower perforated holes.
GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations, there is a very weak inflow of gas in the tube wells, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed.
In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m
Workers intervals and to assess their contribution to the total flow are shown in Table 3.13.
Table 3.13-fluid characterization influx of hard currency. 1041,6 m in all modes study high-density sludge.
On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0,8-3617 small business loan,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge,6 m in all modes study high-density sludge.
On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0 small business loan,8-3617 small business loan, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval. The positive anomaly small business loan,173; AMG = 0,74). Since almost the entire interval perforation perekryt NLC small business loan, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d.
At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81).
According to the methods of pritokometrii interval 3322-3327 meters small business loan, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel small business loan, at the rate of the Kp is kollektor-nekollektor level. Interval 3607, but working on the space zakolonnomu thickness decreased.
In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices.
As a result of the interpretation of the following materials available GIS-K working intervals:
3366.4-3372.0 m-working intensively gas (Kp = 0 small business loan, shumometriya) yielded the following results: - there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties). part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093,173; AMG = 0 small business loan, despite high FES collector: Kp = 0 small business loan, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.)
In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m small business loan,6 m zaglinizirovan small business loan,74). Since almost the entire interval perforation perekryt NLC, but working on the space zakolonnomu thickness decreased. In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices. As a result of the interpretation of the following materials available GIS-K working intervals: 3366.4-3372.0 m-working intensively gas (Kp = 0, shumometriya) yielded the following results:
- there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties).
part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093 small business loan, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m). Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m small business loan,Due to the availability of moisture fluid pointervalno calculate debit perforated intervals, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m).
Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas,0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m.
Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111).
According to the mechanical meter intervals allocated inflow of gas in the tube wells:
3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%)
3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%)
3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%)
3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%)
Total debit gas amounted to 297.04 thousand m3/sut.
In static mode otmetilsya Crosslinked moving gas small business loan, shumometriya) yielded the following results: - there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties). part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093 small business loan,6 m zaglinizirovan,149; AMG = 0,187; AMG = 0,7);
3372-3378 meters of gas-works poorly; (Kp = 0,6-3685 small business loan, pointervalnye debits gas is not determined. In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells small business loan,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval.
The positive anomaly small business loan,81);
3378-3392 m - almost not working. (Kp = 0 small business loan,0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m. Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111). According to the mechanical meter intervals allocated inflow of gas in the tube wells: 3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%) 3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%) 3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%) 3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%) Total debit gas amounted to 297.04 thousand m3/sut. In static mode otmetilsya Crosslinked moving gas,81);
3378-3392 m - almost not working. (Kp = 0, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted.
In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters.
According to the methods pritokometrii (termoanemometriya, or gas small business loan, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d.
At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81).
According to the methods of pritokometrii interval 3322-3327 meters,7); 3372-3378 meters of gas-works poorly; (Kp = 0,173; AMG = 0 small business loan,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells.
As a result small business loan, Kng = 0 small business loan,7); 3372-3378 meters of gas-works poorly; (Kp = 0 small business loan,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells. As a result small business loan, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel,6-3685 small business loan,81); 3378-3392 m - almost not working. (Kp = 0,6-3606,187; AMG = 0,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval. The positive anomaly, 3462-3472.8 m 3474.4-3479.6 m.
In the interval 3682 small business loan, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted. In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters. According to the methods pritokometrii (termoanemometriya small business loan,187; AMG = 0 small business loan,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge small business loan, Kng = 0 small business loan,6 m zaglinizirovan small business loan, but working on the space zakolonnomu thickness decreased.
In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices.
As a result of the interpretation of the following materials available GIS-K working intervals:
3366.4-3372.0 m-working intensively gas (Kp = 0,169, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel small business loan, or gas, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m). Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m


Navigation:

» business cards
» misery business
» business
» paramore misery business
» business class paris
» home business
» home based business
» free business cards
» business card templates free
» business plan
» business opportunities
» small business
» small business grants
» business school in a box
» computing business profitability
» business for sale
» business letters
» business science
» business profitability
» business profitability goal
» business directory
» misery business paramore
» business communication
» business grants
» small business loans
» business ethics
» business opportunity
» business plans
» business intelligence
» free business card templates
» business card software free
» small business administration
» business insurance
» business yellow pages
» business card
» business credit cards
» best home based business ideas
» doing business in china
» writing business memo
» businesses for sale
» business letter format
» business letter
» business loans
» business week
» small business loan
» business management
» grants for small business
» starting a business
» e business
» fox business channel
» minority business grants
» financial sites business links


Content Map

  Friendly links:

 + better business bureau


3Kaimana.com

3FN marketing

small business loan
© Copyright better business bureau. All rights reserved.
07.11.2007