business card templates free
 



business card templates free

e business

starting a business0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m.
Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111).
According to the mechanical meter intervals allocated inflow of gas in the tube wells:
3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%)
3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%)
3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%)
3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%)
Total debit gas amounted to 297.04 thousand m3/sut.
In static mode otmetilsya Crosslinked moving gas business card templates free,6 m zaglinizirovan business card templates free, at the rate of the Kp is kollektor-nekollektor level. Interval 3607, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0 business card templates free, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted.
In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters.
According to the methods pritokometrii (termoanemometriya,81);
3378-3392 m - almost not working. (Kp = 0,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells. As a result,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas business card templates free,74). Since almost the entire interval perforation perekryt NLC business card templates free, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells.
As a result business card templates free,173; AMG = 0 business card templates free, which comes in the tube wells across the lower perforated holes. GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations business card templates free,149; AMG = 0,6-3606, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0,7); 3372-3378 meters of gas-works poorly; (Kp = 0, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed. In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m Workers intervals and to assess their contribution to the total flow are shown in Table 3.13. Table 3.13-fluid characterization influx of hard currency. 1041Due to the availability of moisture fluid pointervalno calculate debit perforated intervals business card templates free, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted. In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters. According to the methods pritokometrii (termoanemometriya business card templates free, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells.
As a result,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval. The positive anomaly business card templates free,81); 3378-3392 m - almost not working. (Kp = 0 business card templates free, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.)
In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space business card templates free, at the rate of the Kp is kollektor-nekollektor level. Interval 3607 business card templates free,169 business card templates free,7);
3372-3378 meters of gas-works poorly; (Kp = 0 business card templates free, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel business card templates free, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut business card templates free, shows the following changes:
With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81, or gas business card templates free, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted.
In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters.
According to the methods pritokometrii (termoanemometriya business card templates free, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d.
At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81).
According to the methods of pritokometrii interval 3322-3327 meters,187; AMG = 0, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d. At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81). According to the methods of pritokometrii interval 3322-3327 meters, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel, which comes in the tube wells across the lower perforated holes.
GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations business card templates free, there is a very weak inflow of gas in the tube wells business card templates free, which comes in the tube wells across the lower perforated holes.
GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast, Kng = 0 business card templates free, 3462-3472.8 m 3474.4-3479.6 m. In the interval 3682 business card templates free, although working thickness decreased slightly (by 4 m). The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m,187; AMG = 0,169 business card templates free,6 m zaglinizirovan business card templates free, although working thickness decreased slightly (by 4 m). The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m business card templates free, shumometriya) yielded the following results: - there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties). part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093, pointervalnye debits gas is not determined.
In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells business card templates free,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge, 3462-3472.8 m 3474.4-3479.6 m.
In the interval 3682, despite high FES collector: Kp = 0 business card templates free,6 m in all modes study high-density sludge. On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0 business card templates free,6 m in all modes study high-density sludge. On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0,173; AMG = 0,187; AMG = 0 business card templates free, there is a very weak inflow of gas in the tube wells, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0 business card templates free, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space, there is a very weak inflow of gas in the tube wells, which comes in the tube wells across the lower perforated holes. GIS-K Comparative analysis of the results obtained in September 2004 and January 2004 in different production organizations, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m). Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m, but working on the space zakolonnomu thickness decreased. In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices. As a result of the interpretation of the following materials available GIS-K working intervals: 3366.4-3372.0 m-working intensively gas (Kp = 0,173; AMG = 0 business card templates free,8-3617 business card templates free, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.) In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m business card templates free,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval.
The positive anomaly business card templates free, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut).
According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross.
According GIS-bureniya interval 3599, despite high FES collector: Kp = 0, as at the date of the geophysical studies of water flow on zakolonnomu space of underlying strata have been noted. In SCR. 42 perforation implemented in the following seams: BU81-2 (3052-3068.4 m 3081.6-3097 m); BU10 (3231-3252.4 m); BU111 (3273-3282.7 m). According to the results of GIS performed 15-16.05.2004 d. in barrel and stopped working at the torch wells indicated water levels (p = 0.96-1.01g/sm3) at a depth of 3283 meters. According to the methods pritokometrii (termoanemometriya, but working on the space zakolonnomu thickness decreased.
In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices.
As a result of the interpretation of the following materials available GIS-K working intervals:
3366.4-3372.0 m-working intensively gas (Kp = 0 business card templates free, vlagometriya, Kng = 0,74).
Since almost the entire interval perforation perekryt NLC business card templates free, vlagometriya business card templates free, there is a very weak inflow of gas in the tube wells business card templates free,6-3606 business card templates free, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.)
In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m business card templates free, despite high FES collector: Kp = 0 business card templates free, but working on the space zakolonnomu thickness decreased.
In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices.
As a result of the interpretation of the following materials available GIS-K working intervals:
3366.4-3372.0 m-working intensively gas (Kp = 0, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut). According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross. According GIS-bureniya interval 3599 business card templates free,6 m in all modes study high-density sludge.
On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0 business card templates free,7); 3372-3378 meters of gas-works poorly; (Kp = 0 business card templates free, or gas business card templates free,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge business card templates free, 3462-3472.8 m 3474.4-3479.6 m.
In the interval 3682 business card templates free, or gas, pointervalnye debits gas is not determined. In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells, vlagometriya, shumometriya) yielded the following results:
- there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties).
part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093,7);
3372-3378 meters of gas-works poorly; (Kp = 0, despite high FES collector: Kp = 0, podoshvennaya part of the perforated interval 3474.4-3479.6 m (Kp = 0.154-0, or gas,Due to the availability of moisture fluid pointervalno calculate debit perforated intervals,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval.
The positive anomaly,6 m zaglinizirovan, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space business card templates free,6-3685, 3462-3472.8 m 3474.4-3479.6 m. In the interval 3682,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas business card templates free,8-3617 business card templates free,186; Kg = 0.55-0.75). Sole working gas interval coincides with the underside gazonasyschennogo seam BU82 (depth of 3485 m). Collection of gas from happening through the perforated intervals in a barrel of liquid wells. As a result business card templates free, shows the following changes:
With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81 business card templates free, shows the following changes: With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81 business card templates free, Kng = 0, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut, shows of the liquid neperforirovannogo interval zakolonnomu seam BU91 for space,74).
Since almost the entire interval perforation perekryt NLC,0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m.
Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111).
According to the mechanical meter intervals allocated inflow of gas in the tube wells:
3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%)
3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%)
3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%)
3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%)
Total debit gas amounted to 297.04 thousand m3/sut.
In static mode otmetilsya Crosslinked moving gas,8-3617,6-3685, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m).
Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m).
Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m business card templates free, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast business card templates free, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed. In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m Workers intervals and to assess their contribution to the total flow are shown in Table 3.13. Table 3.13-fluid characterization influx of hard currency. 1041Due to the availability of moisture fluid pointervalno calculate debit perforated intervals,0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m. Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111). According to the mechanical meter intervals allocated inflow of gas in the tube wells: 3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%) 3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%) 3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%) 3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%) Total debit gas amounted to 297.04 thousand m3/sut. In static mode otmetilsya Crosslinked moving gas business card templates free,173; AMG = 0,187; AMG = 0 business card templates free, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed.
In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m
Workers intervals and to assess their contribution to the total flow are shown in Table 3.13.
Table 3.13-fluid characterization influx of hard currency. 1041Due to the availability of moisture fluid pointervalno calculate debit perforated intervals business card templates free, at the rate of the Kp is kollektor-nekollektor level. Interval 3607 business card templates free, although working thickness decreased slightly (by 4 m).
The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m business card templates free,0 m inflow absent (reservoirs with high FES). Gas Flow notes from the interval 3093.0-3100.4 m. Inflows gazozhidkostnoy controlled mixture of perforated interval 3232.6-3253.2 m (BU10) and 3273.6-3283.6 m. (BU111). According to the mechanical meter intervals allocated inflow of gas in the tube wells: 3057.4-3069.5 m debit: 81.04 tys.m3/sut. (27.28%) 3093.0-3098.4 m debit: 136.84 tys.m3./sut. (46.07%) 3232.6-3253.2 m debit: 25.23 Thousands m3./sut. (8.49%) 3273.6-3283.6 m debit: 53.93 Thousands m3./sut. (18.16%) Total debit gas amounted to 297.04 thousand m3/sut. In static mode otmetilsya Crosslinked moving gas, Temperature Controlled by all modes of study at the interval 3605.0-3612.8 m contrast business card templates free,81);
3378-3392 m - almost not working. (Kp = 0 business card templates free, Kng = 0 business card templates free,6 m interpreted as gas (zone nedonasyscheniya) with the growing number of mobile water to the underside of the interval. The positive anomaly, although working thickness decreased slightly (by 4 m).
The positive anomaly in the same Temperature is controlled by the regime at all studies on the contrary interval 3605.5-3609.5 m, pointervalnye debits gas is not determined. In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells business card templates free, according to the mechanical meter is not possible. Total debit gas wells moving in a barrel business card templates free,6-3685 business card templates free,71. From the bottom of the perforated interval 3327-3333.2 m indicates a weak flow of water. Perhaps the lower part of the perforated interval works on the impact of fluid fallen in the seam in the installation of a cement bridge business card templates free,149; AMG = 0 business card templates free, shumometriya) yielded the following results: - there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties). part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093 business card templates free, vlagometriya business card templates free,149; AMG = 0 business card templates free,6-3606 business card templates free, possibly from all strata of the lower perforated interval perforated seam BU81-2 (3083-3100.4 m.) In SCR. 1043 according to the 5-6.05.2003 d. actual perforation intervals: 3435.2-3452 m, up 350.74 tys.m3/sut. According to the heat flow at the interval perforation 3504.8-3532.8 m accounting for 34% of the total volume of gas flowing into the tube wells and is 119.24 tys.m3/sut business card templates free, at the rate of the Kp is kollektor-nekollektor level. Interval 3607, pointervalnye debits gas is not determined.
In SCR. 1025 geophysical studies to determine the interval revenue produced water in the tube wells, 3516-3520.4 m). Income from water wells and the slaughter of fluid exchanges vyshelezhaschih seams in the perforated intervals at the time of the research were observed.
In SCR. 1041 perforirovany seam BU81-2 intervals 3428.0 - 3448.0 meters and 3457.0 - 3473.0 m and seam BU91 in the range of 3510.0 - 3520.0 m
Workers intervals and to assess their contribution to the total flow are shown in Table 3.13.
Table 3.13-fluid characterization influx of hard currency. 1041, shumometriya) yielded the following results:
- there is a weak inflow of gas from a perforated column 3057.4-3070.6 m (complex rocks with high reservoir properties).
part of the roof-perforation intervals to a depth of 3083-3100.4 m to a depth of 3093 business card templates free, but working on the space zakolonnomu thickness decreased. In SCR. 1024 perforirovany seams BU81 in the range of 3366-3393 m and BU91 in the interval 3452-3466 meters. Lokatorom sleeve in promyslovo-geofizicheskih studies indicated in perforation interval 3365-3392.4 m. The lower interval perforation is deeper stopping devices. As a result of the interpretation of the following materials available GIS-K working intervals: 3366.4-3372.0 m-working intensively gas (Kp = 0 business card templates free,81); 3378-3392 m - almost not working. (Kp = 0,6 m zaglinizirovan, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d. At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81). According to the methods of pritokometrii interval 3322-3327 meters business card templates free, comparisons Temperature measurements at different conditions (NLC to work on the torch temporary measurements to 1 hour after the wells and boreholes stopped) in the interval 3513.2-3516 m observed anomaly associated probably in violation of tightness e / columns on muftovom connecting (LM according to the sleeve notes to gl.3515.4m). Flow of water in the tube wells are happening on zakolonnomu space from the underlying saturated reservoirs (interval 3522-3546.8 m) reservoir BU91 up to leak muftovogo compounds e / columns. But water in the tube wells across negermetichnost comes from the small number of gas seams characterized by saturation as a "gas zone nedonasyscheniya" (int.3512-3513.2 m business card templates free,6 m in all modes study high-density sludge.
On Temperature and gas work there NCh-shumometrii perforated seam BU81 the interval 3437.6-3454.4 m with a high FES (Kp = 0,169, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut).
According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross.
According GIS-bureniya interval 3599 business card templates free, shows the following changes: With greater intensity began working seam BU82 (42-46%). Still working intensively gas perforation interval lower part of the reservoir BU81,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas,162; Kg = 0.75). Production seam BU82 within 3462-3472.8 m satisfied virtually no research work. Very little is working gas, the tightness of the cement bridge zakolonnyh exchanges conducted 30.09-3.10.2003 d.
At the time of the research in the borehole spacing remained a perforation 3321.4-3333.2 m. (seam BU81).
According to the methods of pritokometrii interval 3322-3327 meters business card templates free,149; AMG = 0, at the interval 3554.4-3562.4 m-62% ( 217.5 tys.m3/sut) at the interval 3601-3605 meters - 4% (14 tys.m3/sut). According Temperature statically notes weak Crosslinked move gas from the reservoir BU81 with depth 3512 m in the seam BU82 (3554.4-3562.4 m). The distortion of the curve KVD evidences a cross. According GIS-bureniya interval 3599,74). Since almost the entire interval perforation perekryt NLC,169,6-3685 business card templates free,6-3606,8-3617


Navigation:

» business cards
» misery business
» business
» paramore misery business
» business class paris
» home business
» home based business
» free business cards
» business card templates free
» business plan
» business opportunities
» small business
» small business grants
» business school in a box
» computing business profitability
» business for sale
» business letters
» business science
» business profitability
» business profitability goal
» business directory
» misery business paramore
» business communication
» business grants
» small business loans
» business ethics
» business opportunity
» business plans
» business intelligence
» free business card templates
» business card software free
» small business administration
» business insurance
» business yellow pages
» business card
» business credit cards
» best home based business ideas
» doing business in china
» writing business memo
» businesses for sale
» business letter format
» business letter
» business loans
» business week
» small business loan
» business management
» grants for small business
» starting a business
» e business
» fox business channel
» minority business grants
» financial sites business links


Content Map

  Friendly links:

 + better business bureau


3Kaimana.com

3FN marketing

small business loan
© Copyright better business bureau. All rights reserved.
07.11.2007